Projects
ID | Project Title | Client | Status |
---|---|---|---|
1 | Ubit PP Restoration Project | ExxonMobil/Project Masters Nigeria Ltd | On-going |
2 | Dibi Test Separator 1 & 2 Restoration Project |
Chevron Nigeria Limited | On-going |
3 | LACT Unit Interface Design Project | Aiteo Eastern Exploration and Production Company Limited |
On-going |
4 | Front-End Engineering Design (FEED) of New Egbin Metering Station |
Nigerian Gas Company (NGC)/ OSKA-JO | Completed, January 2019 |
5 | Provision of Maintenance Personnel for Bonga FPSO |
Shell Nigeria Exploration and Production Company Limited (SNEPCO) |
Completed, April 2018 |
6 | Transportation, Installation and Sea-fastening Design and Barge Stability Analysis |
ELSHCON/ SAIPEM | Completed, June 2017 |
7 | In-Field Dehydration Conceptual Study | Eroton Exploration and Production Company |
Completed, June 2017 |
8 | FEED Development for Oshie Flowstation Flaredown Project |
NAOC, Port Harcourt | Completed, December 2016 |
9 | 10,000 BPD Scalable Modular Refinery Feasibility Study |
Suntopway Oil & Gas and Delta State Government |
Completed, November 2016 |
10 | Line End Refurbishment and Modification (LERM) Program Phases A and B |
Mobil Producing, Nigeria | Completed, July 2016 |
11 | FEED Verification and Detail design of Trans Niger Pipeline Loopline Project: Package 1 |
KAZTEC /SHELL Nigeria | Completed, January 2015 |
12 | Design Verification and Fabrication Pipe Fit Assurance For ASASA VB & EDOP QP Project |
ExxonMobil Nigeria | Completed, August 2015 |
13 | Detail engineering design for Buffer Storage Tank to API 620 at Amukpe Project |
Seplat Exploration & Production Company/ Obax |
Completed, August 2015 |
14 | Design of 20.5km Alternative Road to Oziengbe Flowstation & Design of a Reinforced Concrete Bridge to Link NPDC Warri Warehouse |
Nigerian Petroleum Development Company (NPDC) |
Completed, December 2015 |
15 | Provision of Feasibility & Conceptual Study for OMLs 64 & 66 Facilities Field Development |
Nigerian Petroleum Development Company / SIPEC |
Completed, December 2013 |
16 | OML58 Upgrade - Detailed Engineering Design of 42”x45 km OUR Pipeline |
ZB/Total E & P Nigeria | Completed, November 2012 |
17 | Adanga Redevelopment Phase III – TMMP Topside Engineering Design/Modifications Services |
Addax Petroleum Development Co. Nigeria | Completed, March 2011 |
18 | Deep Water Development Projects - Detailed Engineering Design of USAN – SUBSEA PRODUCTION SYSTEM |
Cameron/Total E & P Nigeria | Completed, December 2009 |
19 | Provision of Engineering Services for Ovhor Field Development |
Seplat Exploration & Pro. Company, Nigeria | Completed, July 2012 |
20 | Post-Inspection Engineering Evaluation for 79 Platforms Project |
ExxonMobil, Nigeria | Completed, November 2010 |
21 | Detailed Engineering of Bonga FPSO Stern Boat Catcher |
Dormanlong / Shell Nigeria (SNEPCO) | Completed, January 2008 |
22 | Central Processing Facilities (CPF) Engineering Design, Procurement, Installation & Commissioning at Umusadege |
Midwestern Oil & Gas Company, Nigeria | Completed, March 2008 |
23 | Conceptual & Detailed Design of 12” x 20km Ogbelle – Rumuji Pipeline Project |
Niger Delta Petroleum Resources (NDPR) Nigeria |
Completed, May 2009 |
24 | Conceptual & Detailed Design of NCTL Temporary By - Pass Project |
Shell Nigeria (SPDC) | Completed, December 2008 |
25 | Feasibility Study for Brass Canal / Fire Fighting Pumps Station Revamp Project |
Nigeria Agip Oil Company | Completed, June 2007 |
26 | Engineering Studies and Detailed Design on Adanga Production Complex |
Addax Pet. Development Company, Nigeria | Completed, December 2008 |
27 | OB-OB Gas Plant Upgrade for LNG Trains 4, 5 & 6 Gas Supply |
SAIPEM/ Nigeria Agip Oil Company | Completed, February 2006 |
28 | Detail Design for Isobo A, Ubit K and Ubit H Gas Lift Systems |
Mobil Producing, Nigeria | Completed, April 2006 |
29 | FEED for Gas Lift and Gas Export | SAIPEM/ Nigeria Agip Oil Company | Completed, February 2006. |
30 | Detailed Design of Electrical Utilities for Warri Data Center |
Shell Nigeria (SPDC) | Completed, March 2006 |
31 | Define Phase Engineering for Bonga SW/Aparo Gas Export Pipeline |
Shell Nigeria (SNEPCO) | Completed, December 2005 |
32 | Detailed Design for Ubit B Internal Slots Addition Project |
Mobil Producing, Nigeria | Completed, December 2005 |
33 | Detailed Interface Design for Produced Water Re- injection at Obigbo North |
Shell Nigeria (SPDC) | Completed, January 2006 |
34 | Detailed Design for 8” Gas Line and Riser Repair Project |
Mobil Producing, Nigeria | Completed |
35 | Cawthorne Channel Associated Gas Gathering Pipeline Project (CCAGG) |
Daewoo / Shell Nigeria (SPDC) | Completed |
36 | Detailed Design of 10” x 14 km Gbaran – Kolocreek Bulkline and Extension of Kolocreek f/s Facilities Project |
Shell Nigeria (SPDC) | Completed |
37 | Engineering Evaluation of Failed Mooring System & Detailed Design of Replacement Hose and Structure. Engineering Evaluation of Existing 6” Gas Injection Line & Design of New Gaslift Line |
AMNI International E & P Company, Nigeria |
Completed. |
38 | Bille Community Electrification Project | Shell Nigeria (SPDC) | Completed |
39 | EA PROJECT Layout/Hazardous Area Classification of Granstaff Barge/DP-A Platform |
Shell Nigeria (SPDC) | Completed |
40 | Detailed Design for Enang A (2 & 3) Slots Addition Project |
Mobil Producing, Nigeria | Completed |
41 | Detailed Design for OML-124 Wellhead Hook-Ups and New Flowlines Installations |
Addax Petroleum Dev. Co. Nigeria | Completed |
42 | Detailed Design of Electrical Utilities for Port Harcourt Data Center |
Shell Nigeria (SPDC) | Completed |
43 | Detailed Engineering Design for Edop TEG Restoration |
Mobil Producing, Nigeria | Completed |
44 | Detailed Engineering Designs for Oso Flare Segregation Piping and PSVs Modifications |
Mobil Producing, Nigeria | Completed |
45 | Detailed Design for Power Generation, Transmission and Distribution to Forcados, Ogidigben, Communities |
Shell Nigeria (SPDC) | Completed |
46 | Preparation of Integrated Operating Standards |
Shell Nigeria Gas Limited, Lagos | Completed |
47 | Basic Engineering Studies and Design for the Material Recovery Facilities at Obagi Field – OML 58 |
Elf Petroleum Nigeria Limited | Completed |
48 | Detailed Design for 28” Pipeline Sectional Replacement by Hot Tapping |
Oilserv Limited / Shell Nigeria (SPDC) | Completed |
49 | Detailed Designs for 14” Pipeline Sectional Replacement at Diebu River Crossing and 10” Pipeline Sectional Replacement at Okordia River Crossing |
Shell Nigeria (SPDC) | Completed |
50 | Design of Gas Line Scrapper Traps and Slug Catchers |
Shell Nigeria (SPDC) | Completed |
51 | Afam Flowstation Rehabilitation Design and Afam Gas Plant Rehabilitation Design |
Shell Nigeria (SPDC) | Completed |
ID | Project Title | Client | Status |